MSCM Logo
MANUFACTURER OF SUBSEA PRODUCTS FOR THE OIL AND GAS INDUSTRY WORLDWIDE
Tel: +44 (0) 1494 513223 Fax: +44 (0) 1494 527173
Coronation Road, Cressex Business Park, High Wycombe, Bucks. HP12 3TA
Suitable for intervention using a work class ROV fitted with a standard class 4 rotary torque tool. The stab plates that we are offering to the project have a generic background within the offshore subsea industry and we have detailed below previous projects that have utilised the design.
PROJECT NAME
NO. OF PLATES
DEPTH
STATUS
AGIP Bahr Essalam NC 41. Project
250
Water depth 160 mtr.
Subsea
Total Forvie Project
20
Water depth 150 mtr.
Subsea
Petrofrac Oudna Project
12
Water depth 270 mtr.
Subsea
W.N.T Baccarat Project
2
Water depth 430 mtr.
Subsea
Clough engineering ONGC. G1 Project.
60
Water depth 430 mtr.
Subsea
A.O.G. Gunashli Project.
92
Water depth 280 mtr.
Subsea
Total AKPO Project.
1400
Water depth 1500 mtr.
Subsea
Exxon Kizomba C Mondo Project.
225
Water depth 1500 mtr.
Subsea
A.O.G. West Chirag Project.
80
Water depth 280 mtr.
Subsea
Exxon Kizomba C Saxi Batuque Project.
251
Water depth 1000 mtr.
Subsea
A.T.P. Gomez.
40
Water depth 1000 mtr.
Subsea
ABO Extension
70
Water depth 680 mtr.
Subsea
Coogee Montara
42
Water depth 100 mtr.
Subsea
ENI North Bardawil
34
Water depth 600 mtr.
Subsea
A.O.G. Gunashli Project. Phase 2
40
Water depth 280 mtr.
Subsea
Total Jura Project.
20
Water depth 150 mtr.
Subsea
KG West Project
2
Water depth ? mtr.
Subsea
BP Skarv Project
88
Water depth 500 mtr.
Subsea
Nexus Crux Project
20
Water depth 60 mtr.
Complete
Total AKPO West Extension Project.
60
Water depth 1500 mtr.
Subsea
Total Usan SDU & Bridging Jumper
107
Water depth 1500 mtr.
Subsea
Exxon Kizomba C Gas Gathering Project.
38
Water depth 1500 mtr.
Subsea
Kipper Tuna Project
86
Water depth 170 mtr.
Subsea
ATP Gomez Extension
30
Water depth 1000 mtr.
Subsea
BARRACUDA
32
Water depth 1300 mtr.
Subsea
GOLIAT Project
16
Water depth 1000 mtr.
Subsea
ATP Telemark Project
9
Water depth 1200 mtr.
Subsea
PDVSA Dragon Project
62
Water depth 220 mtr.
Subsea
BP Block 18-31 Angola Project
500
Water depth 2250 mtr.
Subsea
Exxon Kizomba Satellites Project
260
Water depth 1500 mtr.
Subsea
ATP Clipper Project
7
Water depth 1000 mtr.
Subsea
Denise B Project
26
Water depth 500 mtr.
Subsea
Gorgon Jansz Project
220
Water depth Various
Subsea
Santos Fletcher - Finucane
30
Water depth 140 mtr.
Complete
Nexan Golden Eagle Area Development
75
Water depth 140 mtr.
Current
Petrobras 10k Trees Project
672
Water depth 2500 mtr.
Current
ENI Block 1506 Project
442
Water depth 1500 mtr.
Current
CNOOC Panyu
147
Water depth 340 mtr.
Current
Exxon Kizomba Satellites Project Ps II
333
Water depth 1000 mtr.
Current
BP AIOC Chirag Splitter Project
42
Water depth 280 mtr.
Current
Total DDKS Project
26
Water depth 2500 mtr.
Current
Apache Julimar Project
120
Water depth 220 mtr.
Current
The ROV Operating torques are project specific dependant upon system working pressure and the density of population of hydraulic couplings within the stab plate, however the typical operating torques are in the range of standard work class ROV's.